Port connections using 90 degree ploy 3/8 to 1/2 barbs. Lines held back for installation of port fittings by tuck tape. Made fitting installation much easier. Will remove tape before starting procedure because it is attached to exhaust. However, I need to find what is causing the leak before continuing.